Altnagelvin South Block 3.2A, Derry/Londonderry

Altnagelvin South Block Phase 3.2A is a new three storey 16,000m2 hospital facility, connected to the South face of the ‘Tower block’ and the new Pharmacy and Laboratory Services Centre.

£33M
Contract Value
30 Months
Project Duration

Client
Western Health and Social Care Trust

The Project

Phase 3.2A was awarded as a Performance Related Partnering (PRP) contract, the first phase within a PRP framework of which we were continuously monitored to ensure suitability for on-going phases. Our strong performance and delivery in the first phase ensured our extension to Phase 3.2B.

Services & Expertise

During construction a structure of meetings was instigated to monitor progress, design and most importantly, end user needs. The interface with the end user, in the form of a fortnightly liaison meeting, proved invaluable in evolving the design through to construction and ultimately the finished product.