Latest News

Farrans completes new quayside at Port of Nigg

6.07.2022

Highlights:

  • Increase of deep-water quayside to 1,200m+ will fuel growth in supporting the renewables, oil & gas and nuclear energy sectors
  • New East Quay developed to help meet quayside demand within the Port of Nigg and the wider Cromarty Firth
  • Will enable Port of Nigg to bid for and execute Offshore Wind Farm foundation and wind turbine projects simultaneous

 The Port of Nigg has unveiled its new East Quay, which, at 225m long and 50m wide, increases the leading port facility’s deep water quayside capacity to over 1,200m – placing it amongst the largest in the country.

Marine construction works for the East Quay commenced in April 2021, in the midst of the pandemic, with Farrans Construction, delivering the quay on schedule and on budget.

The opening of the new quay is set to be a game changer for the Port of Nigg, enabling it to service multiple large scale Energy sector projects simultaneously and ensuring the port facility has the required infrastructure in place to accommodate the demands for future floating offshore wind sector opportunities.

Jonny Kerr, civil engineering operations director for Farrans Construction, said: “We are pleased to add this project to our extensive marine portfolio and we have worked closely with our client to ensure an on time and on budget completion. The East Quay of Nigg has been a strategically important project for Global Energy and our specialist knowledge of marine civil engineering has been critical in the smooth delivery.

 “Our work in the marine sector plays a critical role in supporting private and public sector organisations in the off-shore renewables industry, logistics, shipping and transportation and we have self-delivered some of the largest marine projects in the UK and Ireland.”

Speaking about the unveiling of the new quay, which has welcomed its first vessel – the Boa Sub C – which is loading out structures fabricated at Nigg for the oil and gas industry, Rory Gunn, Facilities Director, said:

“Our new East Quay helps us better service our existing customer’s needs, in the renewables, oil and gas, and nuclear sectors, and the enhanced capabilities will assist us to attract inward investment with a vision to create long term skilled manufacturing jobs at our port which will become a National hub for the renewables industry. Operationally, the additional quay and associated laydown area provides us with a lot of flexibility, and this multi-million pound investment is further evidence of our commitment to ensure our facility is “best in class” for meeting both existing and future industry demands.

 “It will be a huge selling point for us when tendering for the next generation of floating offshore wind projects, with the additional deep-water quayside allowing us to do the fabrication and assembly of the floating hulls at the port’s South Quay area while the wind turbine integration onto the floating foundations is being conducted at the East Quay.”

Scotland’s most important energy industry port facility

Already Scotland’s most important energy industry port facility, The Port of Nigg is renowned for its world class multi-sector capability, offering unique turnkey solutions to customers in the international energy industry. The port boasts some of the largest construction and assembly shops in Europe, a large dry dock, expansive laydown areas with high ground bearing capacity and deep water quayside. These characteristics together with their unrivaled proven track record and skilled multi-disciplined workforce are the reasons that the port is fast becoming the principle Scottish port for supporting the Renewables industry and Scotland’s efforts towards a NET Zero economy.

Roy MacGregor, Chairman of Global Energy Group, which owns and operates the Port of Nigg commented:

“I can’t underestimate what a huge benefit the new East Quay will be to the Port of Nigg and its supply chain, and what an enhancement the development is to the Cromarty Firth’s bid for Green Freeport status. The increase of our deep-water quayside capacity to over 1,200m provides the necessary infrastructure for supporting the next generation of floating offshore wind at a time when the SOWEC Report and other major studies have identified the Cromarty Firth as the only location in the UK with the physical characteristics and port facilities that could feasibly support their development.”

The multi-million-pound investment in the East Quay has been supported by Highlands & Islands Enterprise (HIE) and the Scottish Government. Stuart Black, chief executive of Highlands and Islands Enterprise, said:

 “The Highlands and Islands region has many natural advantages for renewable energy development and the transition to a net zero economy, and our ports and harbours have a vital role to play. Port of Nigg has been a key player in the energy sector for many years, particularly in the growth of renewables. We are very pleased to have supported the development of this new facility, which will benefit the region’s economy for many years to come.”

At 225m long, 50m wide and offering 12m LAT water depth, the East Quay adds to the port’s Inner Dock Quay (240m), South Quay (370m), West Finger Quay (130m long, 40m wide with a berth on either side and on the end) and Terminal Jetty (which offers 22m LAT water depth).

The deep-water quayside is complemented by extensive laydown area both adjacent to the quay and within the 740,000m2 site, as well as multiple project offices for clients, on site accommodation and a range of on-site services, including mobile and crawler cranes, stevedoring and ships agency services.

The Port is supported by a full package of on-site services from the Global Energy Group portfolio of companies, delivering fabrication, repair, maintenance, enhancement and conversion projects for the renewables, oil & gas and nuclear sectors.

Share